Call today 0794 1285161 / 01837 54369 or email via the contact page, advice is free.     

Below shows a selection of finished projects completed, all of which have been a total refurbishment of the existing room. Each job is unique and different in its own way (even though some look similar). The choice of tiles is always down to the customer.  The length of time it takes to complete a project does depend on the volume of work, on average a guide time would be between 5 and 10 days for a complete refurbishment. Always good to remember - nothing is impossible, just varying degrees of difficulty.